Week 28: Pending for Pre-Handover Meeting

Colour of choice for the rendering : Toffee and Cream Beige (Solver Paint). I'm glad it turned out like what I've imagined. 

The much anticipated keys-handover should be taking place next week if everything goes smoothly on this Friday's pre-handover meeting. It is important to prepare a check list to ensure all the specifications and modifications of the house have been installed. Just to name a few:

1. make sure all power points and lights are working - bring a hairdryer to test it
2. plumbing system are in place - flush the toilets, check the shower head, check every tapware, check the external tap
3. check if there's insulation in the roof area
4. make sure all the knobs,doors,windows and fly screens are installed properly 
5. check the wardrobe sliding doors
6. make sure there's a downpipe for drainage installed
7. make sure the stove top and oven are working. Check all the cabinets are soft closing
8. make sure brickpaving of driveway, alfresco and crossover are installed
9. make sure there are no cracks in the floor, walls and ceiling. 

 Running through the list with your partner or a friend will ensure that you didn't miss anything before the pre-handover meeting. Better still if you could get somebody to go with you.

It won't be long from now=)